Item 1193 - Kosipe-Tapini walk. Track we were to go along, leading -> Gap

Open original Digital object

Identity area

Reference code

AU PMB PHOTO 46-1193

Title

Kosipe-Tapini walk. Track we were to go along, leading -> Gap

Date(s)

  • 17 October 1975 (Creation)

Level of description

Item

Extent and medium

1 35mm slide

Context area

Name of creator

(1942-)

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

Appraisal, destruction and scheduling

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

Available for reference

Conditions governing reproduction

Language of material

Script of material

Language and script notes

Physical characteristics and technical requirements

Finding aids

Allied materials area

Existence and location of originals

Bill Gammage, Canberra, Australia

Existence and location of copies

Access this title at PMB Member Libraries or by contacting the Bureau directly: http://asiapacific.anu.edu.au/pambu/accessing.php

Related units of description

Related descriptions

Notes area

Note

Original image number: 5

Alternative identifier(s)

Access points

Subject access points

Place access points

Name access points

Genre access points

Description control area

Description identifier

Institution identifier

Rules and/or conventions used

Dates of creation revision deletion

Language(s)

Script(s)

Sources

Digital object (Master) rights area

Digital object (Reference) rights area

Digital object (Thumbnail) rights area

Accession area

Related subjects

Related people and organizations

Related genres

Related places